WCRC work continues in area
The Washtenaw County Road Commission has completed several jobs in the Manchester and Bridgewater Township areas recently and the only remaining road construction in the four-township area is the road closure on Sharon Valley Road, over the River Raisin between Prospect Hill and Lamb Roads in Sharon Township.
The bridge replacement is scheduled to be completed in early October; meanwhile, a detour is posted.
You must be logged in to post a comment Login