Fritz Swanson

Austin Road Closed Heading Towards Saline – March 2 through late August

Decrease Font Size Increase Font Size Text Size Print This Page

Screen Shot 2015-03-01 at 10.02.10 AMThe Washtenaw County Road Commission is closing Austin Road between Grass Road and Schill Road in Saline Township for two bridge replacements. This closure will last from March 2 through late August. This will affect traffic travelling directly between Manchester and Saline.

The bridge replacements are on Austin Road over the Saline River, and also Austin Road over the Bauer Drain. Both are located about 2 ½ miles west of Saline. Austin Road will be closed in this area throughout this construction. The “posted detour route” will utilize Clinton Road and US-12 to navigate between Manchester and Saline.

If you have any questions regarding this project, please contact Kelly R. Jones, Senior Project Manager – Construction, at jonesk@wcroads.org or (734) 327-6647.

Further information at this link:  http://www.wcroads.org/node/2819

For as little as $1 a month, you can keep Manchester-focused news coverage alive.
Become a patron at Patreon!

Become a Monthly Patron!

You must be logged in to post a comment Login